Woodworth Dam Replacement, BC

CLIENT: City of Prince Rupert
CONTRACTOR: Eiffage Canada
PROJECT DELIVERY METHOD: Bid-Build (BB)
LOCATION: Prince Rupert, B.C.
PROJECT COST: $17,000,000 CAD
TIMELINE: September 2019 – October 2022

Rockwood Civil Solutions’ Role

  • Developed the cost estimate
  • Provided value engineering proposals
  • Designed innovative means and methods solutions
  • Led First Nations engagement efforts

Project Scope

  • Rock excavation
  • Rock bolting
  • Water diversion sequencing
  • Staged forming and pouring sequence
  • Upgraded access roads

Project Challenges & Solutions

  • Remote Working Area:
    To address the challenge of the remote location, we secured local housing for our workforce, ensuring the team had reliable accommodations throughout the project.
  • High Fluctuating Tides:
    Given the coastal location, high and fluctuating tides posed a challenge for material deliveries. We collaborated with a local barge firm to ensure timely transportation of construction materials.
  • COVID-19 Pandemic:
    The pandemic heightened concerns among our crew. In response, we implemented several protocols to address health and safety, such as providing single accommodations instead of shared, and offering flexible work turnaround schedules to support our team during this challenging period.
  • Poor Rock Quality:
    Upon discovering that the rock quality was subpar, we swiftly re-engineered the rock bolting sequence, enabling us to maintain efficiency in forming and pouring the dam structure.
Woodworth Dam in Prince Rupert BC

A forming system for a retaining wall for the Woodworth Dam in Prince Rupert, BC

Q.E.W. CN/CP Overpass Replacement, Ontario

CLIENT: Ministry of Transportation Ontario (MTO)
CONTRACTOR: Eiffage Canada
PROJECT DELIVERY METHOD: Bid-Build (BB)
LOCATION: Fort Erie, Ontario
PROJECT COST: $41,356,496 CAD
TIMELINE: July 2019 – November 2022

Rockwood Civil Solutions’ Role

  • Developed the cost estimate for the project
  • Negotiated access agreements with CP Rail
  • Provided innovative means and methods solutions to optimize project execution
  • Led First Nations engagement efforts, ensuring community involvement and partnerships
  • Managed negotiations with subcontractors and suppliers to secure competitive pricing and reliable services

Project Challenges & Solutions

  • Third party Track closures:
    CN could not provide adequate track signal personnel:
    – We collaborated with CN and managed the track closure times
  • Site Access:
    Limited Site Access and laydown areas:
    – We collaborated with CP to use their abandoned rail corridor to allow several site access locations and boost productivity
A shoring system for traffic protection and construction staging in Fort Erie

A shoring system for traffic protection and construction staging in Fort Erie – 2020

Halfway River Bridge Construction, BC

CLIENT: BC Ministry of Transportation and Infrastructure (BC MOTI)
CONTRACTOR: Eiffage Canada
PROJECT DELIVERY METHOD: Bid-Build (BB)
LOCATION: Fort St. John, B.C.
PROJECT COST: $104,569,326 CAD
TIMELINE: July 2019 – November 2022

Rockwood Civil Solutions’ Role

  • Developed the cost estimate, ensuring accuracy and project feasibility
  • Designed innovative means and methods solutions for the formwork systems, optimizing construction efficiency
  • Led First Nations engagement, fostering meaningful partnerships and community collaboration throughout the project
  • Led First Nations engagement efforts, ensuring community involvement and partnerships
  • Negotiated with subcontractors and suppliers to secure the best pricing and services for the project’s needs
    Winter concrete pours on several piers on the halfway river bridge in Fort St John BC

    Winter concrete pours on several piers on the halfway river bridge in Fort St John BC

    Strandherd Armstrong Bridge, Ontario

    CLIENT: City of Ottawa
    CONTRACTOR: HHC / GCNA
    PROJECT DELIVERY METHOD: Bid-Build (BB)
    LOCATION: Ottawa, Ontario
    PROJECT COST: $66,000,000 CAD
    TIMELINE: February 2011 – November 2012

    Rockwood Civil Solutions’ Role

    • Provided an cost-to-complete estimate, ensuring financial precision and project feasibility
    • Delivered innovative means and methods solutions for the steel erection, optimizing structural integrity and installation efficiency
    • Managed negotiations with subcontractors and suppliers to secure competitive pricing and reliable materials
      A steel arch erection on the Strandherd Armstrong Bridge in Ottawa

      A steel arch erection on the Strandherd Armstrong Bridge in Ottawa

      Kirby Road Extension, Ontario

      CLIENT: City of Vaughan
      CONTRACTOR: KAPP Infrastructure
      PROJECT DELIVERY METHOD: Design-Build (DB)
      LOCATION: Vaughan, Ontario
      PROJECT COST: $52,700,000 CAD
      TIMELINE: March 2023 – Ongoing

      Rockwood Civil Solutions’ Role

      • Developed the cost estimate to ensure accurate budgeting and project planning
      • Led the contract negotiations
      • Led negotiations with designers to streamline the design process and meet project specifications
      • Managed negotiations with subcontractors and suppliers to secure competitive pricing and reliable resources
      • Directed the development of the project baselines and the project management plan
      • Engaged key stakeholders, facilitating communication and collaboration to ensure smooth project progress
        Kirby Road Extension, Vaughan, Ontario

        Kirby Road Extension between Dufferin St. and Bathurst St. in Vaughan, ON